Padma Multipurpose Bridge
> Length 6.15 KM
> Total construction cost USD 3.8 Billion
> Operation started on 23 June 2022
> Lloyd’s Agency, Chittagong did surveys of Railway Slippers in this project
Third Terminal of Hazrat Shahjalal International Airport, Dhaka, Bangladesh
> Estimated Budget of the whole project USD 2 Billion
> Lloyd’s Agency, Chittagong did surveys of the Transformer and Manual Tray Retriever System in this project
Karnaphuli Tunnel, Chattogram, Bangladesh
> Length 3.32 KM
> The Tunnel connects the southern potential industrial zone of Chittagong to the Chittagong Port
> Total construction cost USD 1 Billion
> Operation started on 28 October 2023
> Lloyd’s Agency, Chittagong did surveys of Sheild Segment in this project
Dhaka Metro Rail, Dhaka, Bangladesh
> Total construction cost USD 2.8 Billion
> The fully elevated line currently operates with 16 stations
> Operation started on 28 December 2022
> Lloyd’s Agency, Chittagong did several External Condition surveys of the Metro Rail Coaches in this project
Matarbari Deep Sea Port, Cox’s Bazar, Bangladesh
> Annual Capacity 1.1 Million TEU Vessel Capacity
> Estimated Budget USD 1.6 Billion
> Lloyd’s Agency, Chittagong did surveys of PHP Pile Pipes in this project
Matarbari Coal – Fired Power Plant, Cox’s Bazar, Bangladesh
> Capacity 1,200 Megawatts (MW)
> Total Construction Cost USD 4.7 Billion
> Operation started on December 2023
> Lloyd’s Agency, Chittagong did surveys of the Insulated Power Cables, Steel Structures, PHC Pile Pipes and other project cargoes in this project
Rampal Coal – Fired Power Plant, Bagerhat, Bangladesh
> Capacity 1,320 Megawatts (MW)
> Estimated investment of USD 2.3 billion
> Operation started on 23 December 2022
> Lloyd’s Agency, Chittagong did surveys of the Anemometer, Steam Generator Component and Boiler Auxiliaries in this project
Payra Thermal Power Plant, Patuakhali, Bangladesh
> Capacity 1,320 Megawatts (MW)
> Total Construction Cost USD 2.48 billion
> Operation started on 15 May 2020
> Lloyd’s Agency, Chittagong did surveys of the Electrical Cables in this project







